• DocumentCode
    735795
  • Title

    Laboratory test set-up for the assessment of PMU time synchronization requirements

  • Author

    Singh, Ravi Shankar ; Hooshyar, Hossein ; Vanfretti, Luigi

  • Author_Institution
    Aalto University, Espoo, Finland
  • fYear
    2015
  • fDate
    June 29 2015-July 2 2015
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper presents the construction of a Hardware-in-the-loop laboratory test set-up designed to assess the time synchronization requirements of Phasor Measurement Units (PMUs). The test set-up also allows to investigate the effects of signal phase shifts caused by current and voltage transformers, errors in timing source and the impact of these errors when determining time synchronization compliance of PMUs. The paper also describes the structure of an IRIG-B time-sync real-time implementation, which allowed real-time hardware-in-the-loop simulation by providing a PMU with a high-accuracy timing source.
  • Keywords
    Accuracy; Indexes; Instruments; Phasor measurement units; Real-time systems; Synchronization; Hardware-in-the-Loop (HIL); IRIG-B; Phasor Measurement Unit (PMU); Real-Time Simulation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    PowerTech, 2015 IEEE Eindhoven
  • Conference_Location
    Eindhoven, Netherlands
  • Type

    conf

  • DOI
    10.1109/PTC.2015.7232731
  • Filename
    7232731