DocumentCode
735795
Title
Laboratory test set-up for the assessment of PMU time synchronization requirements
Author
Singh, Ravi Shankar ; Hooshyar, Hossein ; Vanfretti, Luigi
Author_Institution
Aalto University, Espoo, Finland
fYear
2015
fDate
June 29 2015-July 2 2015
Firstpage
1
Lastpage
5
Abstract
This paper presents the construction of a Hardware-in-the-loop laboratory test set-up designed to assess the time synchronization requirements of Phasor Measurement Units (PMUs). The test set-up also allows to investigate the effects of signal phase shifts caused by current and voltage transformers, errors in timing source and the impact of these errors when determining time synchronization compliance of PMUs. The paper also describes the structure of an IRIG-B time-sync real-time implementation, which allowed real-time hardware-in-the-loop simulation by providing a PMU with a high-accuracy timing source.
Keywords
Accuracy; Indexes; Instruments; Phasor measurement units; Real-time systems; Synchronization; Hardware-in-the-Loop (HIL); IRIG-B; Phasor Measurement Unit (PMU); Real-Time Simulation;
fLanguage
English
Publisher
ieee
Conference_Titel
PowerTech, 2015 IEEE Eindhoven
Conference_Location
Eindhoven, Netherlands
Type
conf
DOI
10.1109/PTC.2015.7232731
Filename
7232731
Link To Document