• DocumentCode
    735809
  • Title

    Optimal reserve grid planning considering reliability

  • Author

    La Fauci, Raffael ; Bader, Jurg ; Design, Grid ; Andersson, Goran

  • Author_Institution
    ewz, Zurich, Switzerland
  • fYear
    2015
  • fDate
    June 29 2015-July 2 2015
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The reserve grid is a redundant MV grid, which serves as an emergency power system (EPS). It is designed to compensate interruptions of the MV grid or substations by offering an independent connection to an additional substation. The challenge is to find the optimal topology regarding costs and reliability. The locations of the customers and the substation have to be considered in the planning of the grid. Here, various optimization methods, which solve the problem are compared. Furthermore, the effects of the reliability stated as posteriori and a priori reliability on the optimal topology are investigated. The results show that all investigated methods can find the optimal solution of the stated problem and a grid without N-1 security can achieve the reliability required.
  • Keywords
    Mathematical model; Optimization methods; Power system reliability; Reliability; Substations; Switches; Topology; Greenfield planning; Optimization; Power system planning; Power system reliability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    PowerTech, 2015 IEEE Eindhoven
  • Conference_Location
    Eindhoven, Netherlands
  • Type

    conf

  • DOI
    10.1109/PTC.2015.7232751
  • Filename
    7232751