DocumentCode
736732
Title
Optimal scheduling for wind farms power generation based on partial information
Author
Yu, Jian ; Liu, Feng ; Li, Peng ; Song, Yongduan
Author_Institution
School of Electronic and Information Engineering, Beijing Jiaotong University, Beijing, 100044, China
fYear
2015
fDate
28-30 July 2015
Firstpage
8941
Lastpage
8946
Abstract
This paper aims to solve the coupled problem of wind farms modeling and wind power generation optimal scheduling. The salient features of the proposed method are as follows: First, the multi-agent model of wind farms power generation is obtained, which consider the influence among wind turbines. Second, the task is formulated as an optimization scheduling problem in terms of wind power generation. Third, the controller is designed by considering the partial system information, and solved based on the Forward & Backward Stochastic Different Equations (FBSDE) and adjoint equations. Numerical simulations are adopted to verify the proposed optimization method for partial information cases.
Keywords
Optimal scheduling; Power systems; Stochastic processes; Wind farms; Wind power generation; Wind turbines; Partial information; backward stochastic different equation; optimal scheduling; synchronization; wind farms;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (CCC), 2015 34th Chinese
Conference_Location
Hangzhou, China
Type
conf
DOI
10.1109/ChiCC.2015.7261053
Filename
7261053
Link To Document