Title :
Improving On-Site Management Practice for Chinese Construction Projects Based on Analytic Hierarchy Process (AHP) Method
Abstract :
Based on the analysis of large number cases, the essay finds that there are many problems on site management of Chinese construction projects in the present. Though Analytic Hierarchy Process(AHP) Method, the essay summarizes the main problems related to schedule, quality and safety. Because construction is a complicated system and every aspect is closely integrated. The management of construction site is especially important. This essay tries to summarize the problems of construction site management and analyze the reasons, hoping to give some reference to operators and managers.
Keywords :
Economics; Project management; Quality management; Safety management; Schedules; Training; On Site Management; Construction Project; Analytic Hierarchy Process Method;
Conference_Titel :
Measuring Technology and Mechatronics Automation (ICMTMA), 2015 Seventh International Conference on
Conference_Location :
Nanchang, China
Print_ISBN :
978-1-4673-7142-1
DOI :
10.1109/ICMTMA.2015.351