Optimization of Project Duration Based on Network Planning Technique
Author :
Guo, Zhen-Ning
fYear :
2015
fDate :
13-14 June 2015
Firstpage :
753
Lastpage :
756
Abstract :
This article illustrates the optimization of project duration by network planning technology in the progress of project management process when the calculated duration cannot meet the target schedule requirements. It proposed an innovative method which can reduce the project time with minimum direct cost increment. Different optimization ways have been studied and corresponding cost increments have been analyzed. The results indicate that the method is capable of using minimum cost to control the project schedule within the planning period.
Keywords :
Acceleration; Buildings; Optimization; Production; Project management; Schedules; Network Planning; Optimization of Project duration; Project Management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Measuring Technology and Mechatronics Automation (ICMTMA), 2015 Seventh International Conference on
Conference_Location :
Nanchang, China
Print_ISBN :
978-1-4673-7142-1
Type :
conf
DOI :
10.1109/ICMTMA.2015.185
Filename :
7263680
Link To Document :
بازگشت