DocumentCode :
743482
Title :
First superconductor integrated into urban grid ´works without a hitch´ [News Briefing]
Author :
Pultarova, Tereza
Volume :
9
Issue :
11
fYear :
2014
fDate :
12/1/2014 12:00:00 AM
Firstpage :
20
Lastpage :
20
Abstract :
THE WORLD´S LONGEST superconductive cable and the first to have been integrated into an urban electricity grid has celebrated six months of flawless operations. Part of the AmpaCity project, the 1km-long 10kV hightemperature superconductive (HTS) cable was built into the inner city grid in Essen, Germany, at the end of April 2014.
fLanguage :
English
Journal_Title :
Engineering & Technology
Publisher :
iet
ISSN :
1750-9637
Type :
jour
DOI :
10.1049/et.2014.1121
Filename :
7055511
Link To Document :
بازگشت