DocumentCode :
765551
Title :
Final commissioning of the Balcones 60 MJ pulsed power supply
Author :
Bray, Robert W. ; Weldon, James M. ; Wehrlen, David ; Spann, Michael
Author_Institution :
Parker Kinetics Designs Inc., Austin, TX, USA
Volume :
27
Issue :
1
fYear :
1991
fDate :
1/1/1991 12:00:00 AM
Firstpage :
433
Lastpage :
437
Abstract :
The Balcones 60 MJ pulsed power supply system is discussed. How the power supply was brought to a full operational state while being used to maintain a rigorous experimental EML shot schedule during the start-up period is discussed. Operational experience acquired as each generator was tested and brought into service, up to full energy and full current discharge, is described. Other topics include routing inspection and maintenance for keeping the power supply at a constant state of readiness, troubleshooting techniques and repair procedures, and safety precautions observed while testing and operating the power supply
Keywords :
electromagnetic launchers; maintenance engineering; power supplies to apparatus; pulsed power technology; safety; testing; 60 MJ; Balcones pulsed power supply; EM launcher; current discharge; generator; maintenance; repair procedures; routing inspection; safety precautions; shot schedule; start-up period; testing; troubleshooting techniques; Character generation; Equations; Kinetic theory; Manufacturing; Personnel; Power supplies; Pulsed power supplies; Shafts; System testing; Welding;
fLanguage :
English
Journal_Title :
Magnetics, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9464
Type :
jour
DOI :
10.1109/20.101072
Filename :
101072
Link To Document :
بازگشت