DocumentCode :
771262
Title :
A new large scale DAS in CEPCO
Author :
Oono, H. ; Kawaharasaki, M. ; Kawai, M. ; Morishita, T. ; Nishi, A. ; Katsuyama, M.
Author_Institution :
Chubu Electr. Power Co., Nagoya, Japan
Volume :
7
Issue :
2
fYear :
1992
fDate :
5/1/1992 12:00:00 AM
Firstpage :
558
Lastpage :
564
Abstract :
The Chubu Electric Power Company (CEPCO) has developed the distribution automation system (DAS) by using minicomputers which monitor and control large and complex distribution networks with maximum reliability and promptness. A significant curtailment of the restoration operation time due to the occurrence of faults is expected by the introduction of the DAS. The authors introduce the DAS that was installed at CEPCO´s Kita Utility Office in December 1989 and report on its operation performance. The objectives of the DAS are to enhance the reliability of the power supply, to improve the service quality for customers, and to improve the efficiency in facility utilization. The DAS connects the utility office online with the supervisory control and data acquisition (SCADA) system at the control center and the total distribution management system at the head office, and it has unique functions that will contribute to integrated distribution automation
Keywords :
SCADA systems; distribution networks; microcomputer applications; power system computer control; power system restoration; CEPCO; Japan; SCADA; distribution automation system; distribution networks; efficiency; faults; management; minicomputers; performance; power supply; power system computer control; reliability; restoration; Automatic control; Automation; Computerized monitoring; Control systems; Large-scale systems; Microcomputers; Power supplies; Power system reliability; Power system restoration; SCADA systems;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.141759
Filename :
141759
Link To Document :
بازگشت