DocumentCode :
771746
Title :
Fast acting load shedding
Author :
Nirenberg, S.A. ; McInnis, D.A. ; Sparks, K.D.
Author_Institution :
Florida Power & Light Co., Miami, FL, USA
Volume :
7
Issue :
2
fYear :
1992
fDate :
5/1/1992 12:00:00 AM
Firstpage :
873
Lastpage :
877
Abstract :
The fast acting load shedding (FALS) function was developed to fulfil a need for a statewide relay that detects a system disturbance that is stable but results in lines operating beyond their ratings, low system voltages, and heavy reactive demand on generating units. The FALS function then sheds enough customer load in a short amount of time to prevent a cascading loss of a line or generator with the possibility of a blackout. The FALS function uses the System Control Center computers and statewide supervisory control and data acquisition (SCADA) communications to act as a really that detects this specific type of disturbance and initiates a controlled load shed. The authors describe the system conditions necessitating the development of the FALS function, the design criteria, its computer implementation, operating experience, and known deficiencies
Keywords :
SCADA systems; load shedding; power system computer control; SCADA; System Control Center computers; cascading loss prevention; computer implementation; customer load shedding; fast acting load shedding; operating experience; statewide relay; supervisory control and data acquisition; system disturbance detection; Communication system control; Control systems; Low voltage; Medical services; Power system dynamics; Power system protection; Power system relaying; Power system security; Power system transients; Power systems;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.141798
Filename :
141798
Link To Document :
بازگشت