Title :
Avoid Miscues During Electrical Switching: Create and Follow Clear, Preplanned, Written Procedures
Author :
Hill, Dennis J. ; L´Esperance, Kenneth A.
Author_Institution :
URS, Cleveland, OH, USA
Abstract :
The operation of electrical power systems is often accomplished safely with planned written switching orders or procedures. These procedures are usually step-by-step executable plans detailing the necessary actions to energize, de-energize, isolate, or alter the configuration of an electrical system for maintenance. Written switching procedures afford the electrical operations crew the opportunity to address preemptively the risks, necessary personnel, notifications, personal protective equipment (PPE), and lockout items needed for safe switching. This article reviews the applicable regulations, technical documentation, risk management, resources, emergency reparation, review/approval, and other basics of developing a successful switching procedure.
Keywords :
maintenance engineering; personnel; power system security; risk management; switches; PPE; clear procedure; electrical operations; electrical power systems; electrical switching; electrical system; emergency reparation; maintenance; necessary personnel; personal protective equipment; planned written switching orders; preplanned procedure; risk management; safe switching; technical documentation; written procedure; Electrical safety; Maintenance engineering; Occupational safety; Power distribution; Power system management; Switching circuits;
Journal_Title :
Industry Applications Magazine, IEEE
DOI :
10.1109/MIAS.2014.2345803