DocumentCode :
775474
Title :
Controlling Accelerator Engineering Costs
Author :
Avery, R.T. ; Breuner, D.J.
Author_Institution :
William M. Brobeck & Associates, Berkeley, California
Volume :
12
Issue :
3
fYear :
1965
fDate :
6/1/1965 12:00:00 AM
Firstpage :
540
Lastpage :
543
Abstract :
Cost control for accelerator engineering involves task definition, planning related expenditures, measuring progress, tabulation of costs and projections, and, most important of all, follow-up for corrections. Accelerator engineering costs are best regulated by the accelerator engineer, since those who are in any way detached from the work cannot exercise the most effective control. The accelerator engineer should be assisted by providing him with an effective system, appropriate forms and reports, and administrative support.
Keywords :
Acceleration; Buildings; Costs; Electrical engineering; Life estimation; Mechanical engineering; Physics; Scheduling; Technical drawing; Testing;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1965.4323691
Filename :
4323691
Link To Document :
بازگشت