Abstract
Northern Ireland Electricity signed agreements in 1990 with Scottish Power, its counterpart in the south of Scotland, for the construction of an HVDC interconnector, known as the Moyle Interconnector, between the companies´ transmission systems. After a protracted period in which all the necessary consents were obtained, contracts have been awarded and, following a construction period of only 27 months, the interconnector started commercial operation at the beginning of 2001.
Keywords
HVDC power convertors; HVDC power transmission; power cables; power system control; power system interconnection; power system protection; thyristor convertors; HVDC interconnector; Moyle interconnector; Northern Ireland Electricity; ScottishPower; commercial operation; control; design; implementation; power cables; project considerations; protection; thyristor valves;
fLanguage
English
Journal_Title
Power Engineering Journal
Publisher
iet
ISSN
0950-3366
Type
jour
DOI
10.1049/pe:20020304
Filename
1015759
Link To Document