DocumentCode
777586
Title
Load rejection operation in conventional power plants in ENEL-Italy
Author
Gadda, E. ; Radice, A.
Author_Institution
ENEL, Rome, Italy
Volume
4
Issue
3
fYear
1989
fDate
9/1/1989 12:00:00 AM
Firstpage
382
Lastpage
391
Abstract
A description of the experience gained in establishing a procedure which trips all fuel input to the boiler and maintains house load operating the turbine on mass and energy stored in the boiler is presented. This procedure was qualified a few years ago and since then has been used in the 320 MW units in operation (the main bulk of ENEL´s thermal capacity) whether equipped with subcritical once-through boilers or with assisted circulation drum boilers. A series of tests carried out on supercritical 660 MW units shows that by adopting the same procedure these large units can also sustain successfully the run back to house load. The procedure has been used in many other thermal units of size ranging between 70 MW to 240 MW and can be performed in most of ENEL´s thermal power plants
Keywords
power station load; thermal power stations; 320 MW; 660 MW; 70 to 240 MW; ENEL; Italy; assisted circulation drum boilers; boiler; load rejection operation; thermal power plants; turbine; Boilers; Cities and towns; Fuels; Maintenance; Power generation; Power system reliability; Testing; Thermoelectricity; Turbines; US Government;
fLanguage
English
Journal_Title
Energy Conversion, IEEE Transactions on
Publisher
ieee
ISSN
0885-8969
Type
jour
DOI
10.1109/60.43239
Filename
43239
Link To Document