President´s Message
Author
Halilcevic, Suad S. ; Hamidovic, Edin ; Gubina, Ferdinand
Author_Institution
Fac. for Electr. Eng., Tuzla Univ., Bosnia-Herzegovina
Volume
22
Issue
7
fYear
2002
fDate
7/1/2002 12:00:00 AM
Firstpage
3
Lastpage
3
Abstract
This letter presents an approach to determining the impact of supplemental reserve and high-MVA-capacity transmission lines on optimal maintenance and repair time. The impact of the supplemental reserve and high-capacity transmission lines is determined by including the availability and costs characteristics. Availability is calculated by taking into account successfully supplied consumer areas, and costs are calculated by taking into account costs of maintenance, repair, and undelivered electric energy. The optimal maintenance and repair time is determined by considering the balance between availability and the costs. The results obtained show that the supplemental reserve and high-capacity transmission lines prolong the maintenance and repair period and reduce the costs.
Keywords
maintenance engineering; power transmission economics; power transmission lines; availability; high-capacity transmission lines; optimal maintenance; optimal repair time; power system operation costs; supplemental reserve; undelivered electric energy; undelivered energy; Availability; Cost function; Maintenance; Power generation; Power supplies; Power system modeling; Power system reliability; Power systems; Power transmission lines; Strontium;
fLanguage
English
Journal_Title
Power Engineering Review, IEEE
Publisher
ieee
ISSN
0272-1724
Type
jour
DOI
10.1109/MPER.2002.1016845
Filename
1016845
Link To Document