DocumentCode :
778075
Title :
President´s Message
Author :
Halilcevic, Suad S. ; Hamidovic, Edin ; Gubina, Ferdinand
Author_Institution :
Fac. for Electr. Eng., Tuzla Univ., Bosnia-Herzegovina
Volume :
22
Issue :
7
fYear :
2002
fDate :
7/1/2002 12:00:00 AM
Firstpage :
3
Lastpage :
3
Abstract :
This letter presents an approach to determining the impact of supplemental reserve and high-MVA-capacity transmission lines on optimal maintenance and repair time. The impact of the supplemental reserve and high-capacity transmission lines is determined by including the availability and costs characteristics. Availability is calculated by taking into account successfully supplied consumer areas, and costs are calculated by taking into account costs of maintenance, repair, and undelivered electric energy. The optimal maintenance and repair time is determined by considering the balance between availability and the costs. The results obtained show that the supplemental reserve and high-capacity transmission lines prolong the maintenance and repair period and reduce the costs.
Keywords :
maintenance engineering; power transmission economics; power transmission lines; availability; high-capacity transmission lines; optimal maintenance; optimal repair time; power system operation costs; supplemental reserve; undelivered electric energy; undelivered energy; Availability; Cost function; Maintenance; Power generation; Power supplies; Power system modeling; Power system reliability; Power systems; Power transmission lines; Strontium;
fLanguage :
English
Journal_Title :
Power Engineering Review, IEEE
Publisher :
ieee
ISSN :
0272-1724
Type :
jour
DOI :
10.1109/MPER.2002.1016845
Filename :
1016845
Link To Document :
بازگشت