• DocumentCode
    784670
  • Title

    Special design and testing aspects of the 345 kV East Fishkill substation

  • Author

    Fogarty, R.P. ; Halleran, T.M. ; Laskowski, L.M. ; Mark, D.A.

  • Author_Institution
    Consolidated Edison Co. of New York, NY, USA
  • Volume
    7
  • Issue
    4
  • fYear
    1992
  • fDate
    10/1/1992 12:00:00 AM
  • Firstpage
    1993
  • Lastpage
    2001
  • Abstract
    The installation of two 135 MVAr capacitor banks in a 345 kV substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. The authors present some of the special problems encountered in the design of the substation and the results of the tests performed during commissioning of the capacitor banks
  • Keywords
    capacitor storage; earthing; reactors (electric); substations; testing; 135 MVAr; 345 kV; East Fishkill substation; capacitor banks; circuit breakers; closing resistors; control cables shielding; grounding system; reactors; testing; Cables; Capacitors; Circuit breakers; Circuit testing; Control systems; Grounding; Inductors; Performance evaluation; Resistors; Substations;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/61.157003
  • Filename
    157003