DocumentCode
784670
Title
Special design and testing aspects of the 345 kV East Fishkill substation
Author
Fogarty, R.P. ; Halleran, T.M. ; Laskowski, L.M. ; Mark, D.A.
Author_Institution
Consolidated Edison Co. of New York, NY, USA
Volume
7
Issue
4
fYear
1992
fDate
10/1/1992 12:00:00 AM
Firstpage
1993
Lastpage
2001
Abstract
The installation of two 135 MVAr capacitor banks in a 345 kV substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. The authors present some of the special problems encountered in the design of the substation and the results of the tests performed during commissioning of the capacitor banks
Keywords
capacitor storage; earthing; reactors (electric); substations; testing; 135 MVAr; 345 kV; East Fishkill substation; capacitor banks; circuit breakers; closing resistors; control cables shielding; grounding system; reactors; testing; Cables; Capacitors; Circuit breakers; Circuit testing; Control systems; Grounding; Inductors; Performance evaluation; Resistors; Substations;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/61.157003
Filename
157003
Link To Document