• DocumentCode
    785763
  • Title

    The NBS Linac Master Control and Personnel Protection System

  • Author

    Spokas, O.E.

  • Author_Institution
    National Bureau of Standards Washington, D. C.
  • Volume
    14
  • Issue
    3
  • fYear
    1967
  • fDate
    6/1/1967 12:00:00 AM
  • Firstpage
    1016
  • Lastpage
    1021
  • Abstract
    The operation of the NBS linear accelerator and its beam handling equipment has been integrated with personnel and equipment protection safeguards and with the occupancy requirements of the linac complex. A mode switch is used to select beam direction and experimental area, and to program the requirements for personnel protection interlocks, beam handling system conditions, building mechanical services, experimental area services, and linac operation. The system includes visual and audible devices to indicate degree of readiness, hazards, faults, interlock information, zone of operation and emergency situations. A forced inspection of potentially dangerous zones, programmed cued taped warning announcements, key interlocks, and flexibility are built-in features. It offers the capability of providing maximum protection to personnel against environmental radiation hazards, and allows utilization of a maximum of laboratory space for varied beam conditions.
  • Keywords
    Control systems; Hazards; Inspection; Linear accelerators; Linear particle accelerator; NIST; Particle beams; Personnel; Protection; Switches;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1967.4324698
  • Filename
    4324698