DocumentCode :
785763
Title :
The NBS Linac Master Control and Personnel Protection System
Author :
Spokas, O.E.
Author_Institution :
National Bureau of Standards Washington, D. C.
Volume :
14
Issue :
3
fYear :
1967
fDate :
6/1/1967 12:00:00 AM
Firstpage :
1016
Lastpage :
1021
Abstract :
The operation of the NBS linear accelerator and its beam handling equipment has been integrated with personnel and equipment protection safeguards and with the occupancy requirements of the linac complex. A mode switch is used to select beam direction and experimental area, and to program the requirements for personnel protection interlocks, beam handling system conditions, building mechanical services, experimental area services, and linac operation. The system includes visual and audible devices to indicate degree of readiness, hazards, faults, interlock information, zone of operation and emergency situations. A forced inspection of potentially dangerous zones, programmed cued taped warning announcements, key interlocks, and flexibility are built-in features. It offers the capability of providing maximum protection to personnel against environmental radiation hazards, and allows utilization of a maximum of laboratory space for varied beam conditions.
Keywords :
Control systems; Hazards; Inspection; Linear accelerators; Linear particle accelerator; NIST; Particle beams; Personnel; Protection; Switches;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1967.4324698
Filename :
4324698
Link To Document :
بازگشت