Title :
A probabilistic reserve With Zero-sum settlement scheme
Author :
Xia, L.M. ; Gooi, H.B. ; Bai, J.
Author_Institution :
Sch. of Electr. & Electron. Eng., Nanyang Technol. Univ., Singapore
fDate :
5/1/2005 12:00:00 AM
Abstract :
A probabilistic reserve scheme with iterated linear programming is proposed to maintain a uniform system reliability level in each dispatch period. Besides, a new zero-sum settlement scheme is introduced. It maintains a net zero sum of payment (loss) and compensation (gain) among the online generators by considering the expected energy not served (EENS) or reserve responsibility share of each unit. Solution results of the IEEE 26-unit system have revealed that the combined probabilistic reserve and zero-sum settlement scheme gives the Gencos stimuli to enhance their performance.
Keywords :
electric generators; linear programming; power generation reliability; power markets; probability; expected energy not served; iterated linear programming; online generator; probabilistic reserve; uniform system reliability; zero-sum settlement scheme; Consumer electronics; Costs; Investments; Linear programming; Maintenance; Power engineering and energy; Power markets; Probability; Reliability engineering; Spinning; EENS; probabilistic reserve; system reliability level; zero-sum;
Journal_Title :
Power Systems, IEEE Transactions on
DOI :
10.1109/TPWRS.2005.846090