• DocumentCode
    793494
  • Title

    IEEE Power Engineering Society

  • Author

    Budhraja, Vikram S.

  • Author_Institution
    Electr. Power Group, LLC, Pasadena, CA, USA
  • Volume
    22
  • Issue
    8
  • fYear
    2002
  • Abstract
    California´s electricity crises started in summer of 2000 when the competitive market became dysfunctional. This article provides: an overview of industry restructuring that led to changes in California´s market; a summary of the restructuring process, competitive market design, and performance; review of the factors that contributed to the electricity crises; and an outline of the reliability agenda for the US electric industry based on lessons from California and structural changes taking place.
  • Keywords
    electricity supply industry; power system reliability; California; USA; competitive electricity market; competitive market design; electricity crises; power industry restructuring; reliability agenda; Business; Companies; Crisis management; Energy management; ISO; Laboratories; Power system management; Power system protection; Power system reliability; Process design;
  • fLanguage
    English
  • Journal_Title
    Power Engineering Review, IEEE
  • Publisher
    ieee
  • ISSN
    0272-1724
  • Type

    jour

  • DOI
    10.1109/MPER.2002.1021355
  • Filename
    1021355