DocumentCode :
796062
Title :
Evaluation of Computer-Based Mine Monitoring and Control at Barnes and Tucker Mine 20
Author :
Berzonsky, Bruce E. ; Breuil, Felix Du ; Yingling, Jon C.
Author_Institution :
Barnes and Tucker Coal Company, 1912 Chestnut Avenue, Barnesboro, PA 15714, USA.
Issue :
5
fYear :
1985
Firstpage :
1121
Lastpage :
1126
Abstract :
A program is being conducted to demonstrate the use of centralized computer control of all conveyors from face to preparation plant. The system incorporates the National Coal Board´s MINOS supplied by Hawker Siddeley Dynamics Engineering and a telephone/pager system supplied by Mine Safety Appliances. This paper summarizes results to date of the demonstration which will provide documentation of installation requirements, operating experience, and impact of the system on mine operations; and will provide information to evaluate the system´s capabilities and its potential as a management tool. Sponsored initially by the Department of Energy and later turned over to the Bureau of Mines, the program, scheduled to continue for another two years, also involves Barnes and Tucker Coal Company, the Bituminous Coal Research (BCR) National Laboratory, and the coal industry through the BCR Mine Monitoring and Communications Committee.
Keywords :
Centralized control; Communications Committee; Computerized monitoring; Documentation; Fuel processing industries; Home appliances; Job shop scheduling; Laboratories; Safety; Telephony;
fLanguage :
English
Journal_Title :
Industry Applications, IEEE Transactions on
Publisher :
ieee
ISSN :
0093-9994
Type :
jour
DOI :
10.1109/TIA.1985.349514
Filename :
4158114
Link To Document :
بازگشت