DocumentCode :
801276
Title :
Plugging into the Zeitgeist
Author :
Braun, Martin ; Arnold, Gunter ; Laukamp, Hermann
Author_Institution :
Decentralized Ancillary Services, ISET in Kassel, Kassel
Volume :
7
Issue :
3
fYear :
2009
Firstpage :
63
Lastpage :
76
Abstract :
Germany is the country with the largest installed PV capacity in the world. As a result, Germany needs to be one of the first countries to look at adequate network integration. To tackle the challenges of the power system with regard to high PV penetration in the future, incentive systems are already formed and prepared that go one step further with regard to system integration. Also, grid codes for grid connection to the distribution network are defined that require grid-supportive behavior from PV systems. Real network integration by providing ancillary services for system operation is the aim of these new measures in Germany. Integration studies with different perspectives are performed in Germany.
Keywords :
photovoltaic power systems; power generation economics; power generation reliability; Germany; PV capacity; active customer networks; ancillary services; commercial aggregation concepts; distribution network; grid codes; grid connection; photovoltaic network integration; Biomass; Energy consumption; Hydroelectric power generation; Photovoltaic systems; Power generation; Power supplies; Renewable energy resources; Solar power generation; Wind energy generation; Wind turbines;
fLanguage :
English
Journal_Title :
Power and Energy Magazine, IEEE
Publisher :
ieee
ISSN :
1540-7977
Type :
jour
DOI :
10.1109/MPE.2009.932309
Filename :
4907282
Link To Document :
بازگشت