DocumentCode :
801551
Title :
Operation and Improvement of the Cornell 10 GeV Electron Synchrotron
Author :
Tigner, Maury
Author_Institution :
Cornell University Ithaca, New York
Volume :
18
Issue :
3
fYear :
1971
fDate :
6/1/1971 12:00:00 AM
Firstpage :
957
Lastpage :
959
Abstract :
Performance figures for the past year are presented. Several improvements in equipment and technique that have had a significant impact on our physics program are discussed. Among these are the installation of two external electron beam systems, chopping of the linac beam, adjustable beam bump shaping, improved shielding, remote controlled targets, new methods of beam sharing and new modulators for the RF system. A brief presentation of our future plans is made.
Keywords :
Control systems; Electron beams; Linear particle accelerator; Optical modulation; Particle beams; Particle scattering; Physics; Radio frequency; Shape control; Synchrotrons;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1971.4326243
Filename :
4326243
Link To Document :
بازگشت