• DocumentCode
    802739
  • Title

    Engineering the Baseball Magnet System

  • Author

    Henning, C.D. ; Nelson, R.L. ; Chargin, A.K. ; Denhoy, B.S. ; Harshbarger, F.

  • Author_Institution
    Lawrence Radiation Laboratory, University of California Livermore, Calif.
  • Volume
    18
  • Issue
    4
  • fYear
    1971
  • Firstpage
    290
  • Lastpage
    295
  • Abstract
    The Baseball II magnet system has satisfactorily completed engineering testing at LRL. Over a three day period the magnet was lowered to 30°K by a helium refrigerator. Then the magnet was filled with liquid helium from the 10,000 liter storage dewar and energized to about 75% of its capability. The electrical and magnet quench systems performed satisfactorily. However, helium loss rates were greater than necessary because the permanent heat shield was not installed. A plasma beam line is being completed that incorporates superconducting magnetic shielding to protect the injected beam from the Baseball II fringe field.
  • Keywords
    Energy storage; Helium; Magnetic shielding; Particle beam injection; Particle beams; Plasmas; Protection; Refrigeration; Superconducting magnets; System testing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1971.4326357
  • Filename
    4326357