DocumentCode :
80283
Title :
Reporting Available Demand Response
Author :
Samarakoon, Kamalanath ; Ekanayake, Janaka ; Jenkins, Nick
Author_Institution :
Sch. of Eng., Cardiff Univ., Cardiff, UK
Volume :
4
Issue :
4
fYear :
2013
fDate :
Dec. 2013
Firstpage :
1842
Lastpage :
1851
Abstract :
Demand response is increasingly important in many power systems but Transmission System Operators (TSO) require confirmation that the response is available if it is to be used effectively. Demand response may be used to minimise the amount of spinning reserve obtained from partially loaded generators. The ability of the proposed smart metering communication system in the U.K. to report the available demand response from domestic appliances was examined. This communication system expects to send all data traffic at an average rate of about 190 Mbytes per minute through a central Data Communication Company (DCC) to any actor operating in the power system. It is unlikely that this communication system will, in addition, support reporting demand response in near real-time. Using load profiles of fridges, cooking appliances and washers and dryers, the load profiles of 40 000 houses were constructed. These load profiles were used to calculate the average number of load changes in a typical house, a 11/0.4 kV transformer and a high voltage substation. Using these average numbers of load changes and the number of transformers and substations in the U.K. power system, the number of messages sent by all smart meters in the U.K. was calculated. It is shown that the wide area network proposed for the U.K. need to send an additional 162 Mbytes per minute to report demand response in near real-time. Then, a hierarchically arranged communication system that follows the hierarchy of electrical network was examined. It was assumed that aggregating units are installed at distribution transformers and substations. It is shown that by aggregating and sending only measurement changes, the number of bytes sent through the U.K. smart metering communication system per minute could be reduced from 162 M to 30 k. This has important implications as the U.K. is now finalizing the specifications for smart metering communications for about 27 million smart electricity meters that will be instal- ed in the period 2014-2020.
Keywords :
demand side management; distribution networks; power engineering computing; refrigerators; smart meters; substations; transformers; wide area networks; DCC; Data Communication Company; TSO; U.K. power system; U.K. smart metering communication system; data traffic; demand response; distribution transformer; domestic appliance; electrical network; high voltage substation; load profile; partially loaded generator; smart electricity meter; transmission system operator; wide area network; Communication networks; Home appliances; Load management; Power measurement; Smart meters; Substations; Wide area networks; Communication network; demand response; load control; smart grid; smart meter; supply and demand;
fLanguage :
English
Journal_Title :
Smart Grid, IEEE Transactions on
Publisher :
ieee
ISSN :
1949-3053
Type :
jour
DOI :
10.1109/TSG.2013.2258045
Filename :
6521385
Link To Document :
بازگشت