• DocumentCode
    804662
  • Title

    Discussion on "Ratefixing" and "Time study" at the Coventry Section of the Institution

  • Author

    Griffiths, F. ; Ellerby ; Boyes, J.A. ; Harper ; Holdom ; Cosley ; Aiers ; Brandish ; Buckland ; Pugsley ; Jones ; Dawtrey

  • Volume
    11
  • Issue
    9
  • fYear
    1932
  • fDate
    4/15/1905 12:00:00 AM
  • Firstpage
    400
  • Lastpage
    411
  • Abstract
    MR. F. GRIFFITHS: The time at my disposal can only allow for the sketchiest outline of the subject, my chief difficulty having been to decide what to leave out. I have at the beginning drawn a line at what I term scientific planning on a mass production basis wherein output is specified and plant must be modelled to give it, and confined myself to the aspect of moderate production of varying articles. Details of any particular scheme other than descriptive ones have also been left out because I appreciate that often any particular scheme is inapplicable to other than the conditions under which it is operating. I may have laid myself open to the charge of rambling all over the field, but to take a dogmatic stand upon such a subject would be absurd.
  • fLanguage
    English
  • Journal_Title
    Production Engineers, Journal of the Institution of
  • Publisher
    iet
  • ISSN
    0368-2757
  • Type

    jour

  • DOI
    10.1049/jipe:19320050
  • Filename
    4907620