DocumentCode
806356
Title
Discussion on "Progressing of work in the shops" at the Western Section of the Institution
Author
Wilson ; Shread ; Kenworthy ; Organ ; Foster ; Attwood ; Saville ; Milton ; Higgins
Volume
13
Issue
9
fYear
1934
fDate
9/1/1934 12:00:00 AM
Firstpage
504
Lastpage
506
Abstract
Mr. Wilson: What is your percentage of progress staff to production staff? How do you deal with drawing office change of design? How do you deal with drawing office change of design? With regard to conveyors going through machine shop to assembly bed, does that mean there is no inspection and that parts are not passed through the finished stores?
fLanguage
English
Journal_Title
Production Engineers, Journal of the Institution of
Publisher
iet
ISSN
0368-2757
Type
jour
DOI
10.1049/jipe:19340057
Filename
4907912
Link To Document