• DocumentCode
    806356
  • Title

    Discussion on "Progressing of work in the shops" at the Western Section of the Institution

  • Author

    Wilson ; Shread ; Kenworthy ; Organ ; Foster ; Attwood ; Saville ; Milton ; Higgins

  • Volume
    13
  • Issue
    9
  • fYear
    1934
  • fDate
    9/1/1934 12:00:00 AM
  • Firstpage
    504
  • Lastpage
    506
  • Abstract
    Mr. Wilson: What is your percentage of progress staff to production staff? How do you deal with drawing office change of design? How do you deal with drawing office change of design? With regard to conveyors going through machine shop to assembly bed, does that mean there is no inspection and that parts are not passed through the finished stores?
  • fLanguage
    English
  • Journal_Title
    Production Engineers, Journal of the Institution of
  • Publisher
    iet
  • ISSN
    0368-2757
  • Type

    jour

  • DOI
    10.1049/jipe:19340057
  • Filename
    4907912