DocumentCode :
810982
Title :
Operation of the NAL Main Ring Extraction System
Author :
Bleser, E.J. ; Edwards, H.T. ; Fisk, H.E. ; Hornstra, F. ; McCarthy, J.D. ; Oleksiuk, L.W. ; Peoples, J., Jr. ; Rode, C.H.
Author_Institution :
National Accelerator Laboratory¿ Batavia, Illinois
Volume :
20
Issue :
3
fYear :
1973
fDate :
6/1/1973 12:00:00 AM
Firstpage :
502
Lastpage :
504
Abstract :
The NAL Main Ring extraction system has delivered both slow and fast extracted beam at 100, 200 and 300 GeV. Construction progress, operating conditions, instrumentation and beam characteristics are discussed.
Keywords :
Apertures; Instruments; Ionization chambers; Laboratories; Magnets; Mesons; Neutrino sources; Particle beams; Protons; Structural beams;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1973.4327162
Filename :
4327162
Link To Document :
بازگشت