Application of advanced after-laying test to long-distance 275 kV XLPE cable lines
Author
Ota, H. ; Ichihara, M. ; Miyamoto, N. ; Kitai, S. ; Maruyama, Y. ; Fukasawa, M. ; Takehana, H.
Author_Institution
Chubu Electric Power Co. Inc., Nagoya, Japan
Volume
10
Issue
2
fYear
1995
fDate
4/1/1995 12:00:00 AM
Firstpage
567
Lastpage
579
Abstract
Long-distance XLPE cable lines were laid over a distance of 26.9 km using the newly established 275 kV XLPE cable technology and in-situ jointing technique. Field AC HV withstand testing was conducted on these lines as the after-laying test-the first such test for long-distance EHV XLPE cable lines. For this test, small resonance type AC withstand HV test equipment was developed. A new system was also established for direct and simultaneous measurement of partial discharge over the entire cable length. One latent defect was detected in this test, proving that the test method is extremely effective in confirming the quality of XLPE cable lines
Keywords
XLPE insulation; cable jointing; charge measurement; insulation testing; partial discharges; power cable insulation; power cable testing; power cables; 26.9 km; 275 kV; AC HV withstand testing; XLPE cable lines quality; after-laying test; in-situ jointing; long-distance XLPE cable lines; partial discharge measurement; small resonance withstand HV test equipment; Cable shielding; Circuit testing; Conductors; Contamination; Inspection; Partial discharges; Power cable insulation; Power cables; Production facilities; Shipbuilding industry;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/61.400876
Filename
400876
Link To Document