Title :
Planning system operations to meet NO/sub x/ constraints
Author :
Hess, Steve W. ; Parker, Doug ; Alms, John E. ; Le, Khai D. ; Day, John T. ; Malone, Michael J.
fDate :
7/1/1992 12:00:00 AM
Abstract :
How Southern California Edison modified its operating practices to meet NO/sub x/ constraints is described. To measure NO/sub x/ levels on a real-time basis, continuous emissions monitoring systems were installed at major gas plants. To capture the impact of NO/sub x/ constraints, a program was developed to assist operating personnel in formulating NO/sub x/-compliance strategies. System costs and benefits and future plans are detailed.<>
Keywords :
air pollution detection and control; nitrogen compounds; thermal power stations; NO/sub x/ air pollution control; Southern California Edison; continuous emissions monitoring systems; operating personnel; thermal power stations; Boilers; Command and control systems; Computational modeling; Computer simulation; Energy management; Environmental management; Meeting planning; Power generation; Power system planning; Switches;
Journal_Title :
Computer Applications in Power, IEEE