• DocumentCode
    815338
  • Title

    Evaluation of the Nuclear Steam Supply System Instrumentation and Control Equipment during Initial Maine Yankee Operation

  • Author

    Dowd, G.T. ; Wood, E.C. ; Veirs, J.W.

  • Author_Institution
    Yankee Atomic Electric Company Westboro, Massachusetts
  • Volume
    21
  • Issue
    1
  • fYear
    1974
  • Firstpage
    940
  • Lastpage
    949
  • Abstract
    This paper evaluates the initial installation, startup, and operation of the Maine Yankee Nuclear Steam Supply System (NSSS) instrumentation and control equipment. Major instrumentation and control system and components will be evaluated with regard to problems which occurred during initial testing and operations. Resulting modifications are described.
  • Keywords
    Combustion; Control equipment; Control systems; Inductors; Instruments; Monitoring; Power engineering and energy; Power generation; Protection; System testing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1974.4327581
  • Filename
    4327581