DocumentCode
815338
Title
Evaluation of the Nuclear Steam Supply System Instrumentation and Control Equipment during Initial Maine Yankee Operation
Author
Dowd, G.T. ; Wood, E.C. ; Veirs, J.W.
Author_Institution
Yankee Atomic Electric Company Westboro, Massachusetts
Volume
21
Issue
1
fYear
1974
Firstpage
940
Lastpage
949
Abstract
This paper evaluates the initial installation, startup, and operation of the Maine Yankee Nuclear Steam Supply System (NSSS) instrumentation and control equipment. Major instrumentation and control system and components will be evaluated with regard to problems which occurred during initial testing and operations. Resulting modifications are described.
Keywords
Combustion; Control equipment; Control systems; Inductors; Instruments; Monitoring; Power engineering and energy; Power generation; Protection; System testing;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1974.4327581
Filename
4327581
Link To Document