Title :
Zion Startup and Operating Experience
Author :
Wagner, George P.
Author_Institution :
Zion Generating Station Commonwealth Edison Company Zion, Illinois
Abstract :
This paper describes several significant events related to the startup and initial operation of Zion Generating Station. Among the events described are a diode installation that resulted in failure of one redundant Engineered Safeguard logic and a wiring reversal that negated one safeguards function. A series of electrolytic capacitor failures are presented and the NSSS vendor´s proposed corrective action is supplied. Three major electrical failures are described; these include a reactor coolant pump motor and both main generators.
Keywords :
Capacitors; Coolants; Diodes; Fuels; Inductors; Life testing; Logic; Nuclear power generation; Power generation; Wiring;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1976.4328339