DocumentCode :
822914
Title :
Zion Startup and Operating Experience
Author :
Wagner, George P.
Author_Institution :
Zion Generating Station Commonwealth Edison Company Zion, Illinois
Volume :
23
Issue :
1
fYear :
1976
Firstpage :
757
Lastpage :
764
Abstract :
This paper describes several significant events related to the startup and initial operation of Zion Generating Station. Among the events described are a diode installation that resulted in failure of one redundant Engineered Safeguard logic and a wiring reversal that negated one safeguards function. A series of electrolytic capacitor failures are presented and the NSSS vendor´s proposed corrective action is supplied. Three major electrical failures are described; these include a reactor coolant pump motor and both main generators.
Keywords :
Capacitors; Coolants; Diodes; Fuels; Inductors; Life testing; Logic; Nuclear power generation; Power generation; Wiring;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1976.4328339
Filename :
4328339
Link To Document :
بازگشت