DocumentCode :
825510
Title :
Integrating preventive maintenance planning and production scheduling for a single machine
Author :
Cassady, C. Richard ; Kutanoglu, Erhan
Author_Institution :
Dept. of Ind. Eng., Univ. of Arkansas, Fayetteville, AR, USA
Volume :
54
Issue :
2
fYear :
2005
fDate :
6/1/2005 12:00:00 AM
Firstpage :
304
Lastpage :
309
Abstract :
Preventive maintenance planning, and production scheduling are two activities that are inter-dependent but most often performed independently. Considering that preventive maintenance, and repair affect both available production time, and the probability of machine failure, we are surprised that this inter-dependency seems to be overlooked in the literature. We propose an integrated model that coordinates preventive maintenance planning decisions with single-machine scheduling decisions so that the total expected weighted completion time of jobs is minimized. Note that the machine of interest is subject to minimal repair upon failure, and can be renewed by preventive maintenance. We investigate the value of integrating production scheduling with preventive maintenance planning by conducting an extensive experimental study using small scheduling problems. We compare the performance of the integrated solution with the solutions obtained from solving the preventive maintenance planning, and job scheduling problems independently. For the problems studied, integrating the two decision-making processes resulted in an average improvement of approximately 2% and occasional improvements of as much as 20%. Depending on the nature of the manufacturing system, an average savings of 2% may be significant. Certainly, savings in this range indicate that integrated preventive maintenance planning, and production scheduling should be focused on critical (bottleneck) machines. Because we use total enumeration to solve the integrated model for small problems, we propose a heuristic approach for solving larger problems. Our analysis is based on minimizing total weighted completion time; thus, both the scheduling, and maintenance problems favor processing shorter jobs in the beginning of the schedule. Given that due-date-based objectives, such as minimizing total weighted job tardiness, present more apparent trade-offs & conflicts between preventive maintenance planning, and job scheduling, we believe that integrated preventive maintenance planning & production scheduling is a worthwhile area of study.
Keywords :
Weibull distribution; decision making; integrated manufacturing systems; job production systems; job shop scheduling; optimisation; preventive maintenance; production planning; reliability theory; single machine scheduling; Weibull distribution; decision-making process; due-date-based objectives; heuristic approach; integrated model; interdependency; job completion time; job scheduling; machine failure; manufacturing system; minimal repair; preventive maintenance planning; production scheduling; production time; single machine scheduling; total weighted completion time reduction; trade-off; Decision making; Job production systems; Job shop scheduling; Manufacturing systems; Operations research; Preventive maintenance; Probability distribution; Process planning; Production planning; Single machine scheduling; Minimal repair; Weibull distribution; optimization; preventive maintenance; production scheduling; renewal;
fLanguage :
English
Journal_Title :
Reliability, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9529
Type :
jour
DOI :
10.1109/TR.2005.845967
Filename :
1435724
Link To Document :
بازگشت