• DocumentCode
    827926
  • Title

    Status Report on the Unilac

  • Author

    Bohne, O.

  • Author_Institution
    GSI, Gesellschaft fÿr Schwerionenforschung mbH Darmstadt, Fed. Rep. of Germany
  • Volume
    24
  • Issue
    3
  • fYear
    1977
  • fDate
    6/1/1977 12:00:00 AM
  • Firstpage
    1070
  • Lastpage
    1075
  • Abstract
    A review on the first year of accelerator operation is given. Improvement activities, which have been initiated to bring the machine up to its design characteristics, are reported. Supplementary installations, devised to extend the design characteristics are briefly mentioned finally.
  • Keywords
    Acceleration; Centralized control; Control systems; Inspection; Ion accelerators; Ion beams; Ion sources; Particle beams; Processor scheduling; Stability;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1977.4328853
  • Filename
    4328853