• DocumentCode
    829023
  • Title

    Synchronization of the Zero Gradient Synchrotron (ZGS) and the Fast-Cycling Booster II Injector

  • Author

    Rauchas, A.V.

  • Author_Institution
    Argonne National Laboratory Argonne, Illinois 60439
  • Volume
    24
  • Issue
    3
  • fYear
    1977
  • fDate
    6/1/1977 12:00:00 AM
  • Firstpage
    1414
  • Lastpage
    1416
  • Abstract
    The planned method of booster injection into the ZGS requires the stacking of two booster beam bunches into the radial betatron phase space of the ZGS and necessitates precise synchronization of the two accelerators during the injection period. The requirement of maintaining independent radio-frequency (RF) steering control does not allow the frequencies of both accelerators to be locked. A synchronizer has been developed which detects a coincidence zero crossing of the two RFs, anticipates the next coincidence, and at that time, generates trigger pulses for the booster extraction and ZGS injection systems. It also maintains control of the sequence in which the total phase space area of the ZGS is loaded. Synchronizer accuracy is obtained by using high speed digital logic circuits. Design considerations and system operation are discussed.
  • Keywords
    Acceleration; Frequency synchronization; Laboratories; Particle beams; Pulse generation; Radio control; Radio frequency; Stacking; Structural beams; Synchrotrons;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1977.4328962
  • Filename
    4328962