Abstract :
This paper presents the problems encountered in the underground medium-voltage distribution system at a large manufacturing facility of Western Electric Company, Inc. Three inservice faults and subsequent test failures were experienced within a 5-month period in 1963. A dc overpotential test program was initiated, as a result of which, the decision was made to replace the entire underground system.