DocumentCode
829097
Title
Operating Experience with the Resonance Extraction Slow Spill Control System at the Zero Gradient Synchrotron
Author
Faber, M.M. ; Potts, C.W. ; Zolecki, R.A.
Author_Institution
Argonne National Laboratory Argonne, Illinois 60439
Volume
24
Issue
3
fYear
1977
fDate
6/1/1977 12:00:00 AM
Firstpage
1437
Lastpage
1439
Abstract
Simultaneous resonance extraction to two proton lines became operational in spring of 1975. The spill quality was initially poor due to 100% structure in the two to six kHz range. This paper describes the empirical techniques developed to provide a smooth spill. These techniques consist of applying radial or azimuthal disturbances to the proton beam. It has been found that the most effective disturbing frequency depends uniquely on the beam momentum. Quite an array of new equipment had to be built for magnetic control of the unbunched beam. Brief descriptions of this equipment are provided.
Keywords
Control systems; Intensity modulation; Laboratories; Magnetic devices; Magnetic resonance; Particle beams; Proton accelerators; Radio frequency; Springs; Synchrotrons;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1977.4328970
Filename
4328970
Link To Document