DocumentCode :
829175
Title :
Synchronous Transfer of Beam from the Booster to the Main Ring in the KEK Proton Synchrotron
Author :
Kimura, Y. ; Kawakubo, T. ; Takata, K. ; Kamei, T.
Author_Institution :
National Laboratory for High Energy Physics Oho-machi, Tsukuba-gun, Ibaraki-ken, 300-32, Japan
Volume :
24
Issue :
3
fYear :
1977
fDate :
6/1/1977 12:00:00 AM
Firstpage :
1461
Lastpage :
1463
Abstract :
The KEK main ring is filled with nine successive beam pulses from the fast cycling booster synchrotron during the injection. Booster bunches are synchronously transferred into stationary rf buckets of the main ring preserving the booster rf structure. At the transfer, longitudinal phase and momentum of the beam bunch extracted from the booster are matched to those defined in the main ring within errors of ???????? ~ 10?? and ????p/p?? ~4 ?? 10-4.
Keywords :
Acceleration; Frequency; Laboratories; Linear particle accelerator; Particle beams; Proton accelerators; Shape control; Space stations; Synchrotrons; Voltage;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1977.4328978
Filename :
4328978
Link To Document :
بازگشت