DocumentCode
829175
Title
Synchronous Transfer of Beam from the Booster to the Main Ring in the KEK Proton Synchrotron
Author
Kimura, Y. ; Kawakubo, T. ; Takata, K. ; Kamei, T.
Author_Institution
National Laboratory for High Energy Physics Oho-machi, Tsukuba-gun, Ibaraki-ken, 300-32, Japan
Volume
24
Issue
3
fYear
1977
fDate
6/1/1977 12:00:00 AM
Firstpage
1461
Lastpage
1463
Abstract
The KEK main ring is filled with nine successive beam pulses from the fast cycling booster synchrotron during the injection. Booster bunches are synchronously transferred into stationary rf buckets of the main ring preserving the booster rf structure. At the transfer, longitudinal phase and momentum of the beam bunch extracted from the booster are matched to those defined in the main ring within errors of ???????? ~ 10?? and ????p/p?? ~4 ?? 10-4.
Keywords
Acceleration; Frequency; Laboratories; Linear particle accelerator; Particle beams; Proton accelerators; Shape control; Space stations; Synchrotrons; Voltage;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1977.4328978
Filename
4328978
Link To Document