DocumentCode :
83015
Title :
Optimal Scheduling for Highway Emergency Repairs Under Large-Scale Supply–Demand Perturbations
Author :
Shangyao Yan ; Chu, James C. ; Yu-Lin Shih
Author_Institution :
Dept. of Civil Eng., Nat. Central Univ., Jhongli, Taiwan
Volume :
15
Issue :
6
fYear :
2014
fDate :
Dec. 2014
Firstpage :
2378
Lastpage :
2393
Abstract :
In this paper, we develop a model for emergency repair problems under large-scale supply-demand perturbations. The model formulation proposed in this paper has the following key features. First, a novel time-space network flow technique is adopted to generate detailed schedules for repair teams and allow dynamic updates of the network due to perturbations. Second, the original schedules prior to the perturbations are considered by controlling the total difference between the original schedule and the adjusted schedule. Third, to reduce computational complexity, the model is formulated with different levels of detail (individual teams versus a team group). The model is also formulated as a special mixed-integer network flow problem with side constraints, which is characterized as NP-hard. An ant-colony-system-based hybrid global search algorithm is developed to efficiently solve large-scale problems. To test how well the model formulation and the heuristic algorithm may perform in actual operations, we conduct a case study using actual data from the 1999 Chi-Chi earthquake in Taiwan. The results show that the proposed model and solution algorithm perform very well and thus have great potential for assisting with the making of emergency repair decisions in the event of disasters given large-scale perturbations in supply and demand.
Keywords :
ant colony optimisation; computational complexity; earthquakes; emergency management; maintenance engineering; minimisation; supply and demand; Chi-Chi earthquake; NP-hard problem; Taiwan; ant-colony-system-based hybrid global search algorithm; computational complexity reduction; disaster event; dynamic network updates; emergency repair decision making; heuristic algorithm; highway emergency repairs; individual teams; large-scale problems; large-scale supply-demand perturbations; mixed-integer network flow problem; model formulation; optimal scheduling; repair teams; side constraints; team group; time-space network flow technique; total difference control; Algorithm design and analysis; Ant colony optimization; Disaster management; NP-hard problem; Scheduling; Ant colony system (ACS); emergency repair; large-scale supply–demand perturbations; large-scale supply???demand perturbations; threshold accepting (TA) algorithm; time–space network; time???space network;
fLanguage :
English
Journal_Title :
Intelligent Transportation Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
1524-9050
Type :
jour
DOI :
10.1109/TITS.2014.2313628
Filename :
6799990
Link To Document :
بازگشت