Title :
The Positron-Electron Project-PEP
Author_Institution :
LBL-SLAC Joint PEP Group Berkeley and Stanford, California
fDate :
6/1/1977 12:00:00 AM
Abstract :
PEP, an 18-GeV electron-positron colliding-beam storage ring facility at SLAC, is being built by a team from LBL and SLAC. Construction is under way and completion is scheduled for Fall of 1979. This report summarizes the design of the facility and reports on the status of the project.
Keywords :
Acceleration; Electron beams; International collaboration; Linear accelerators; Particle beams; Positrons; Research and development; Storage rings; Structural beams; Synchrotron radiation;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1977.4329104