Title :
Status Report on D. C. I.
Author :
The Orsay Storage Ring Group
Author_Institution :
Laboratoire de l´Acc??l??rateur Lineaire Universit?? de Paris-Sud, Centre d´Orsay, Orsay, France
fDate :
6/1/1977 12:00:00 AM
Abstract :
Ring 1 of D. C.I. is operational since July 1976 and has been used since then for e+ e-collisions as well as a synchrotron radiation facility. First injection was made in Ring 2 in December 1976. It is hoped to bring Ring 2 to the level of performances of Ring 1 and then test the space charge compensation. Single and two-beam behaviour of Ring 1 are discussed. Present performances are given and future steps are briefly sketched.
Keywords :
Magnetic resonance; Magnets; Performance evaluation; Positrons; Radio frequency; Radio spectrum management; Space charge; Storage rings; Synchrotron radiation; Testing;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1977.4329110