• DocumentCode
    837088
  • Title

    Running in of Vicksi and First Operating Experience

  • Author

    Ziegler, K.

  • Author_Institution
    Hahn-Meitner-Institut fÿr Kernforschung Berlin GmbH, Bereich Kern- und Strahlenphysik, Berlin, Germany
  • Volume
    26
  • Issue
    2
  • fYear
    1979
  • fDate
    4/1/1979 12:00:00 AM
  • Firstpage
    1871
  • Lastpage
    1878
  • Abstract
    The assembly of the accelerator combination VICKSI is essentially completed. Six different ions have been accelerated to 15 different energies during the running in and acceptance period. The tests have shown that all essential beam specifications are fulfilled. 1160 hours of beam time for experiments have been scheduled since March of this year. About 60% of that time the beam was actually available. Training of operators, a higher degree of automatic tune up, and finishing the beam transport system to the target areas will be the main task for the coming year.
  • Keywords
    Acceleration; Assembly; Cyclotrons; Finishing; Ion accelerators; Ion sources; Magnets; Structural beams; Testing; Voltage;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1979.4329769
  • Filename
    4329769