DocumentCode
837088
Title
Running in of Vicksi and First Operating Experience
Author
Ziegler, K.
Author_Institution
Hahn-Meitner-Institut fÿr Kernforschung Berlin GmbH, Bereich Kern- und Strahlenphysik, Berlin, Germany
Volume
26
Issue
2
fYear
1979
fDate
4/1/1979 12:00:00 AM
Firstpage
1871
Lastpage
1878
Abstract
The assembly of the accelerator combination VICKSI is essentially completed. Six different ions have been accelerated to 15 different energies during the running in and acceptance period. The tests have shown that all essential beam specifications are fulfilled. 1160 hours of beam time for experiments have been scheduled since March of this year. About 60% of that time the beam was actually available. Training of operators, a higher degree of automatic tune up, and finishing the beam transport system to the target areas will be the main task for the coming year.
Keywords
Acceleration; Assembly; Cyclotrons; Finishing; Ion accelerators; Ion sources; Magnets; Structural beams; Testing; Voltage;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1979.4329769
Filename
4329769
Link To Document