DocumentCode
837169
Title
Optimal Long Range hydro Scheduling in the Integrated Power System
Author
Viramontes, F.A. ; Hamilton, H.B.
Author_Institution
Instituto Tecnologico de Monterrey
Issue
1
fYear
1978
Firstpage
292
Lastpage
299
Abstract
The integrated power system which includes fossil fired, nuclear and hydro units has need for a planning model suitable for minimizing system energy costs over a specific time period in the long range time frame. This paper presents such a model. Predicted partial and total forced outages, scheduled down time for various unit maintenance activities, cost of operation for various valve loadings and stochastic river flow data are inputs to a program which yields hydro energy scheduling for most economic loading over the time frame.
Keywords
Cost function; Dynamic programming; Nuclear power generation; Power system modeling; Power system planning; Power systems; Reservoirs; Rivers; Senior members; Valves;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1978.354480
Filename
4181424
Link To Document