• DocumentCode
    837169
  • Title

    Optimal Long Range hydro Scheduling in the Integrated Power System

  • Author

    Viramontes, F.A. ; Hamilton, H.B.

  • Author_Institution
    Instituto Tecnologico de Monterrey
  • Issue
    1
  • fYear
    1978
  • Firstpage
    292
  • Lastpage
    299
  • Abstract
    The integrated power system which includes fossil fired, nuclear and hydro units has need for a planning model suitable for minimizing system energy costs over a specific time period in the long range time frame. This paper presents such a model. Predicted partial and total forced outages, scheduled down time for various unit maintenance activities, cost of operation for various valve loadings and stochastic river flow data are inputs to a program which yields hydro energy scheduling for most economic loading over the time frame.
  • Keywords
    Cost function; Dynamic programming; Nuclear power generation; Power system modeling; Power system planning; Power systems; Reservoirs; Rivers; Senior members; Valves;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1978.354480
  • Filename
    4181424