DocumentCode
837886
Title
Optimal Hydro Scheduling at the Bonneville Power Administration
Author
Gagnon, C.R. ; Bolton, J.F.
Author_Institution
Boeing Computer Services, Inc.
Issue
3
fYear
1978
fDate
5/1/1978 12:00:00 AM
Firstpage
772
Lastpage
776
Abstract
The problem of hydroelectric scheduling is formulated as an unconstrained nonlinear optimization problem using penalty functions for the constraints and the method of conjugate gradients for optimization.
Keywords
Constraint optimization; Control systems; Dynamic programming; Economic forecasting; Environmental economics; Hydroelectric power generation; Power generation economics; Power system economics; Processor scheduling; Resource management;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1978.354548
Filename
4181494
Link To Document