DocumentCode :
838340
Title :
Isochronism Studies at IUCF
Author :
Friesel, D.L. ; Jones, W.P. ; Kowalski, E.A.
Author_Institution :
Indiana University Cyclotron Facility
Volume :
26
Issue :
2
fYear :
1979
fDate :
4/1/1979 12:00:00 AM
Firstpage :
2408
Lastpage :
2410
Abstract :
A non-intercepting, charge sensitive, sampling beam phase probe, similar to the design developed for the 15 MeV injector cyclotron, was recently installed on the moveable south valley probe of the Indiana 200 MeV main stage cyclotron. The probe permits continuous measurement of beam phase from inflection to extraction radius at beam intensities as low as 200 nanoamperes. The measured phase histories obtained show that small deviations from the predictions of our field mapping data are required for isochronous acceleration. The characteristics of the phase probe and the results of the beam phase measurements are discussed.
Keywords :
Acceleration; Assembly; Coils; Cyclotrons; Magnetic field measurement; Particle beams; Phase measurement; Probes; Sampling methods; Schottky diodes;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1979.4329889
Filename :
4329889
Link To Document :
بازگشت