• DocumentCode
    838416
  • Title

    Alignment, Plumbing and Bearing Adjustments for Vertical-Shaft Hydroelectric Generating Units

  • Author

    Alley, W.T. ; Petermann, J.E. ; Harvison, Roy C.

  • Author_Institution
    U. S. Army-Corps of Engineers
  • Issue
    4
  • fYear
    1978
  • fDate
    7/1/1978 12:00:00 AM
  • Firstpage
    1208
  • Lastpage
    1216
  • Abstract
    This paper describes detailed procedures for a- lightning and plumbing vertical shaft hydro units. As- found measurements, analysis of date, corrective measures, and the adjustments of several types of bearings are described.
  • Keywords
    Concrete; Filling; Footwear; Hydroelectric power generation; Lakes; Measurement units; Rivers; Shafts; Turbines; Wires;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1978.354602
  • Filename
    4181549