DocumentCode :
838416
Title :
Alignment, Plumbing and Bearing Adjustments for Vertical-Shaft Hydroelectric Generating Units
Author :
Alley, W.T. ; Petermann, J.E. ; Harvison, Roy C.
Author_Institution :
U. S. Army-Corps of Engineers
Issue :
4
fYear :
1978
fDate :
7/1/1978 12:00:00 AM
Firstpage :
1208
Lastpage :
1216
Abstract :
This paper describes detailed procedures for a- lightning and plumbing vertical shaft hydro units. As- found measurements, analysis of date, corrective measures, and the adjustments of several types of bearings are described.
Keywords :
Concrete; Filling; Footwear; Hydroelectric power generation; Lakes; Measurement units; Rivers; Shafts; Turbines; Wires;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1978.354602
Filename :
4181549
Link To Document :
بازگشت