DocumentCode :
838803
Title :
Inclusion of Inter-Area Transmission in Production Costing Simulation
Author :
Adamson, A.M. ; Kenney, J.F. ; Desell, A.L. ; Garver, L.L.
Author_Institution :
New York Power Pool
Issue :
5
fYear :
1978
Firstpage :
1481
Lastpage :
1488
Abstract :
Traditionally, production costing simulation programs have ignored inter-area transmission restrictions which may, in actual daily system operation, cause suboptimal system wide generating unit dispatch. With the advent of large scale pooling and operating agreements and concomitant pool wide economic dispatch, a need has arisen for system planners to be able to recognize transmission limitations in production costing studies. This paper presents a technique which allows such limitations to be considered. In addition, the paper outlines how this tool can be used to aid system planners in determining adequate inter-area transfer capacity and give relative system-wide transmission requirements for alternate generating unit siting strategies.
Keywords :
Capacity planning; Costing; Costs; Economic forecasting; Large-scale systems; Load modeling; Power generation economics; Power system economics; Power system modeling; Production systems;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1978.354639
Filename :
4181587
Link To Document :
بازگشت