DocumentCode
838815
Title
Update on Power Generation in Canada to 2000 A. D.
Author
Broe, K.L.
Author_Institution
Canadian General Electric Co. Limited
Issue
5
fYear
1978
Firstpage
1496
Lastpage
1500
Abstract
The original Paper appears in IEEE Transactions on Power Apparatus and Systems, January/ February 1977, Volume PAS-96, Number 2, pages 38 to 43. It covered the forecasting work done from June to December 1973, as part of the strategic planning process for Canadian General Electric´s Power Generation Business. The forecast covered the period 1973 to 2000 and included all hydraulic turbines and generators, fossil and nuclear turbine-generators, and gas turbine-generators, that were expected to be installed in Canada, by year, in this time frame.
Keywords
Delay; Economic forecasting; History; Hydraulic turbines; Load forecasting; Nuclear power generation; Power & Energy Society; Power generation; Statistics; Strategic planning;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1978.354641
Filename
4181589
Link To Document