• DocumentCode
    838815
  • Title

    Update on Power Generation in Canada to 2000 A. D.

  • Author

    Broe, K.L.

  • Author_Institution
    Canadian General Electric Co. Limited
  • Issue
    5
  • fYear
    1978
  • Firstpage
    1496
  • Lastpage
    1500
  • Abstract
    The original Paper appears in IEEE Transactions on Power Apparatus and Systems, January/ February 1977, Volume PAS-96, Number 2, pages 38 to 43. It covered the forecasting work done from June to December 1973, as part of the strategic planning process for Canadian General Electric´s Power Generation Business. The forecast covered the period 1973 to 2000 and included all hydraulic turbines and generators, fossil and nuclear turbine-generators, and gas turbine-generators, that were expected to be installed in Canada, by year, in this time frame.
  • Keywords
    Delay; Economic forecasting; History; Hydraulic turbines; Load forecasting; Nuclear power generation; Power & Energy Society; Power generation; Statistics; Strategic planning;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1978.354641
  • Filename
    4181589