• DocumentCode
    845695
  • Title

    Test Accumulation Ring for Numatron Project - TARN -

  • Author

    Hirao, Y. ; Chida, K. ; Hattori, T. ; Hori, T. ; Katayama, T. ; Mizobuchi, A. ; Mutou, M. ; Nakanishi, T. ; Noda, A. ; Omata, K. ; Tokuda, N. ; Tsujikawa, H. ; Watanabe, S. ; Yamada, S. ; Yoshizawa, M. ; Ezura, E. ; Sasaki, H. ; Miyahara, A.

  • Author_Institution
    Institute for Nuclear Study, University of Tokyo, Tokyo, Japan
  • Volume
    26
  • Issue
    3
  • fYear
    1979
  • fDate
    6/1/1979 12:00:00 AM
  • Firstpage
    3730
  • Lastpage
    3735
  • Abstract
    A Test Accumulation Ring for NUMATRON Project, TARN, is now under construction at INS, University of Tokyo. Heavy ions from the SF Cyclotron such as N5+ with an energy of 8.5 MeV per nucleon, are planned to be injected and stacked in the ring by a combination of multiturn injection and RF stacking method Expected intensity of the stacked beam, e.g. N5+, is 2 × 1010 particles, and a survival rate of 90 % is anticipated at the pressure of 1 × 10-10 torr during a stacking time of 1 sec. In this paper, the present status of the ring is described as well as the performances of the major subsystems.
  • Keywords
    Cyclotrons; Ion accelerators; Ion beams; Magnets; Particle beam injection; Physics; Radio frequency; Stacking; Structural beams; Testing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1979.4330594
  • Filename
    4330594