DocumentCode :
845906
Title :
The SRS: Progress Report on the Dedicated Synchrotron Radiation Source at Daresbury; and Operation of a 600 MeV Booster
Author :
Thompson, D.J.
Author_Institution :
Daresbury Laboratory, Warrington WA4 4AD, U.K.
Volume :
26
Issue :
3
fYear :
1979
fDate :
6/1/1979 12:00:00 AM
Firstpage :
3803
Lastpage :
3805
Abstract :
Design of the 2 GeV Storage Ring is virtually complete and construction will be finished in April 1980. The injector, a 600 MeV 10 Hz synchrotron, has been commissioned and its performance is reported.
Keywords :
Acceleration; Klystrons; Laboratories; Linear accelerators; Linear particle accelerator; Magnets; Storage rings; Structural beams; Synchrotron radiation; Undulators;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1979.4330614
Filename :
4330614
Link To Document :
بازگشت