Title :
The SRS: Progress Report on the Dedicated Synchrotron Radiation Source at Daresbury; and Operation of a 600 MeV Booster
Author_Institution :
Daresbury Laboratory, Warrington WA4 4AD, U.K.
fDate :
6/1/1979 12:00:00 AM
Abstract :
Design of the 2 GeV Storage Ring is virtually complete and construction will be finished in April 1980. The injector, a 600 MeV 10 Hz synchrotron, has been commissioned and its performance is reported.
Keywords :
Acceleration; Klystrons; Laboratories; Linear accelerators; Linear particle accelerator; Magnets; Storage rings; Structural beams; Synchrotron radiation; Undulators;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1979.4330614