DocumentCode
849056
Title
Jocassee pumped storage projectߞStartup testing and operating experience
Author
Waltman, R.H. ; Howell, R.E.
Author_Institution
Duke Power Company, Charlotte, North Carolina
Volume
94
Issue
4
fYear
1975
fDate
7/1/1975 12:00:00 AM
Firstpage
1410
Lastpage
1416
Abstract
The intent of this paper is to offer useful information to those who are designing or are about to begin operation of pumped storage installations for the first time. It describes Duke Power Company´s design, checkout, and precomraercial operation techniques and experiences with Jocassee Pumped-Storage Station (Units 1 & 2 of an eventual 4 Unit Station). Particular emphasis is made on two methods of pump starts, Semi-synchronous and Reduced Voltage, including the control and monitoring equipment involved.
Keywords
AC motors; Acceleration; History; Monitoring; Power systems; Regulators; Switches; Synchronous motors; Testing; Voltage control;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/T-PAS.1975.31979
Filename
1601581
Link To Document