DocumentCode :
849056
Title :
Jocassee pumped storage projectߞStartup testing and operating experience
Author :
Waltman, R.H. ; Howell, R.E.
Author_Institution :
Duke Power Company, Charlotte, North Carolina
Volume :
94
Issue :
4
fYear :
1975
fDate :
7/1/1975 12:00:00 AM
Firstpage :
1410
Lastpage :
1416
Abstract :
The intent of this paper is to offer useful information to those who are designing or are about to begin operation of pumped storage installations for the first time. It describes Duke Power Company´s design, checkout, and precomraercial operation techniques and experiences with Jocassee Pumped-Storage Station (Units 1 & 2 of an eventual 4 Unit Station). Particular emphasis is made on two methods of pump starts, Semi-synchronous and Reduced Voltage, including the control and monitoring equipment involved.
Keywords :
AC motors; Acceleration; History; Monitoring; Power systems; Regulators; Switches; Synchronous motors; Testing; Voltage control;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/T-PAS.1975.31979
Filename :
1601581
Link To Document :
بازگشت