• DocumentCode
    849056
  • Title

    Jocassee pumped storage projectߞStartup testing and operating experience

  • Author

    Waltman, R.H. ; Howell, R.E.

  • Author_Institution
    Duke Power Company, Charlotte, North Carolina
  • Volume
    94
  • Issue
    4
  • fYear
    1975
  • fDate
    7/1/1975 12:00:00 AM
  • Firstpage
    1410
  • Lastpage
    1416
  • Abstract
    The intent of this paper is to offer useful information to those who are designing or are about to begin operation of pumped storage installations for the first time. It describes Duke Power Company´s design, checkout, and precomraercial operation techniques and experiences with Jocassee Pumped-Storage Station (Units 1 & 2 of an eventual 4 Unit Station). Particular emphasis is made on two methods of pump starts, Semi-synchronous and Reduced Voltage, including the control and monitoring equipment involved.
  • Keywords
    AC motors; Acceleration; History; Monitoring; Power systems; Regulators; Switches; Synchronous motors; Testing; Voltage control;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/T-PAS.1975.31979
  • Filename
    1601581