Installation of Detroit Edison gas insulated substations
Author :
Hathaway, George H. ; Sparks, Ward W.
Author_Institution :
The Detroit Edison Company, Detroit, Michigan
Volume :
94
Issue :
5
fYear :
1975
Firstpage :
1608
Lastpage :
1617
Abstract :
This paper discusses the installation of three Detroit Edison 120kV gas insulated substations - Caniff, Midtown and Cato. These substations, all located in Detroit, were installed between October 1972 and June 1973. Discussion topics include the shipment, foundation, assembly and wiring of metal enclosed components, SF6gas processing and high voltage field testing.
Keywords :
Adders; Assembly; Circuit breakers; Gas insulation; Packaging machines; Power transformer insulation; Springs; Substations; Sulfur hexafluoride; Switchgear;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/T-PAS.1975.32002
Filename :
1601604
Link To Document :
بازگشت